35 KV Generator14th Floor of Newark Highrise
2014 - 2 Megawatt Generator hoisted to 14th floor of a downtown Newark Highrise. 2017 - Megawatt Generator hoisted to 14th floor of a...


35 KV Temp Electric Servicefor an entire Newspaper Printing Facility
Install a 2.0 Megawatt generated for 100% site backup power.


AEROFARMS
Hydroponic Farming - Newark, NJ Assisted design pilot facility for future production lines.


BLUE APRON
Linden, NJ High volume multiple food production lines. All stainless-steel wiring methods. Completed in 4 weeks per line.


MONDELEZ
Fair Lawn Bakery - Fairlawn, NJ High volume “Oreo” production. 5 different equipment vendors from around the world. 90 days – start to...